Quote Originally Posted by DFW HOYA View Post
"Structural problems have plagued Kehoe Field since its construction in 1942 and then reconstruction on the roof of Yates Field House in 1979. The field was first repaired in 1987 at a cost of $1.8 million before being repaired again in 2002 for $7 million. The problems with the field stem from the concrete roof, which does not properly drain rainwater. Over time, the lightweight concrete roof deteriorated from pooling water, leading to unsafe field conditions. Prior to the field’s closing, club athletes had complained about uneven playing surfaces, exposed concrete and large sections of torn-up artificial turf."




http://www.thehoya.com/university-id...f-kehoe-field/
Just to clarify, what you said about Kehoe Field applies equally to Shaw Field?

Or did I miss a step here?